The content of this publication is subject to copyright of JSC TD ENERPRED and cannot be reproduced (even in part) without appropriate permission. JSC TD "ENERPRED" reserves the right to make any changes to the design and characteristics of the tool offered in this catalog without prior notice. Instrument specifications, including weight, dimensions and other parameters, may vary slightly.
Model | Capacity, t | Tension capacity, ton | Stroke, mm | Rated pressure, Bar | Length of the bursting, m | Soil | Dimensions, mm (BxLxH) | Weight, kg | |||||
UG100Т | 100 | 50 | 1100 | 70 | до 50 | I-III | 500 | × | 2360 | × | 660 | 714 |
Model |
UG100Т |
Capacity, t | ||||
Tension capacity, ton | ||||
Stroke, mm | ||||
Rated pressure, Bar | ||||
Length of the bursting, m | ||||
Soil | ||||
Dimensions, mm (BxLxH) | ||||
Weight, kg |
UG100Т | Capacity, t | Tension capacity, ton | Stroke, mm | Rated pressure, Bar | Length of the bursting, m | Soil | Dimensions, mm (BxLxH) | Weight, kg | |||||
100 | 50 | 1100 | 70 | до 50 | I-III | 500 | × | 2360 | × | 660 | 714 |
Диаметр(внешний/внутрений), мм | Масса, кг | |
Наконечник | 60 | 2,1 |
Штанга (длина 1 м) | 48 | 14 |
Расширители | 130 | 8,5 |
180 | 13,2 | |
270 |
33 | |
155 | 11,7 | |
250 | 31,0 | |
Зацеп | 120/95 | 14 |
170/140 | 23 | |
120/100 | 14,3 | |
143/124 | 17,1 | |
230/208 | 36,3 |
Рекомендуемые станции | Цикл прокола (прямой ход/возврат) 1 метра насыпи* |
с бензоприводом
|
|
НБР-2,4И40-1 |
7 мин. / 3 мин. 30 сек.
|
НБР-5,0И40-1 |
3 мин. 30 сек. / 1 мин. 40 сек.
|
НБР-10,0И100-1 |
1 мин. 45 сек. / 50 сек.
|
с электроприводом
|
|
НЭР-2,8И40Т1 |
6 мин. 10 сек. / 3 мин.
|
НЭР-5,0И40Т1 |
3 мин. 30 сек. / 1 мин. 40 сек.
|
НЭР-10,0И40Т1 |
1 мин. 45 сек. / 50 сек.
|
* Расчётное время не включает в себя подготовительные и заключительные работы, замену штанг.
UG100T designed for trenchless laying of various types of underground utilities (water, sewer, electric cable, etc..) By a puncture in the soil category I-III under highways, tramway, railway embankments, marshy soils, forests, etc. followed by pulling cable, HDPE pipe or metal.Includes tip. Additionally, the installation is completed expanders with hooks and rods. By request of the customer of their characteristics (depending on the diameter of the pipe and pushes soil properties) and the number may vary.
We have much to be proud of, because of our
partners leading companies in Russia and Eastern Europe:
If you have any questions, contact us and we will respond to them
Contact the managerWe invite you to mutually beneficial cooperation for the promotion of the tool marks "Enerpred" in all regions of our country and abroad.
Send requestWe offer you to download our product catalog in PDF format
Download